Contents
 Home
    Referral Program
       About Prodsol
       Prospective Clients
       Prospective Connectors
       Prospective Sponsors
 Cases
 Testimonials
 Solutions
    Marketing Solution
    Sales Solution
    Operations Solution
    Production Solution
    Project Solution
    Innovation Solution
    Distribution Solution
    Culture Change Solution
 Services
    Drim Seminars
    Drim Workshops
    Drim Projects
    Drim JumpStart!s
    Defragmenting Time Workshop
    Project Streamlining Workshop
 Take Action
 Clients
 Company
    Vision and Values
    Founders
    History
    News
    Contact Us


Standard Dramatic Improvement Solutions

Marketing Solution
Sales Solution
Operations Solution
Production Solution
Project Solution
Innovation Solution
Distribution Solution
Culture Change Solution

The Production Solution

The Production Solution increases capacity dramatically and reduces lead-time and inventory dramatically.  Our Production Solution is based on Eli Goldratt's TOC Production Solution.

Indicators

Demand exceeds capacity, lead-time is long and inventory is high.

Ultimate Goal

Dramatic increase in capacity on dramatically shorter lead-time and dramatically lower inventory levels.

Performance-Limiting Problem

Variation in capacity in different steps in different production flows, compounded by fluctuations in market demand.

Conventional Solution

Work longer shifts, buy more capacity and increase batch-size to increase efficiency everywhere.

Simple Breakthrough Solution

Maximise productivity at the bottleneck only - to match demand; reduce performance everywhere else to synchronise to it and protect only the bottleneck with an inventory buffer, removing all other inventory buffers.

Go to the HOME PageGo to the NEXT page